KM6USO.net

Power Upgrade Completed

Published in System Updates. Tags: , .

Power Upgrade Completed

Following an extended power outage and UPS failure, I was able to upgrade the backup battery system in the lab that supports our collection of Allstar hubs and nodes. After this $280 investment, Club 38 and related services should be able to run uninterrupted next time we have an extended power outage. Please do not hesitate to contact me in the future if you have any difficulty connecting to the system.

 

KM6USO.net Amateur Radio Blog and Learning Journal
Copyright © 2021-25 Brian McBreen. All rights reserved. The postings on this site are my own and do not necessarily represent my employer’s positions, strategies, or opinions.